8 May 2024

Grey water pipes

the-process-bg

Reflow Marine’s cross sector experience and credentials quantifying our ability to provide a fast, cost-effective solution to an extensive range of Marine problems avoiding the disruption of removal and replacement. Reflow Marine’s processes and expertise significantly reduce the time – and hence the resources – required in traditional replacement. Cleaning and lining the pipe in situ results in speed of repair & rehabilitation, reduced disruption to interiors and significant reduction in costs.

Using traditional methods and technology for the replacement of pipes on Super Yachts or cruise liners, , has always been extremely time-consuming. Taking time out to work on removing and replacing pipes means whatever is being replaced is out of service for a significant period of time, this has additional consequences in having to remove interiors to access the existing pipe and then the additional expense of replacement.

Another Super Yacht is a perfect example. 280+ metres of Grey water system including and Ballast and Vents were cleaned and lined. Using Reflow Marine’s processes provided the owners and shipyard with the technology and expertise to continue with ongoing, important additional projects and meant that their team experienced no delay or disruption to their other project schedules.

Share this post:
Facebook
Twitter
LinkedIn
WhatsApp

Discover more articles